ADL Technology AdL Technology (Columbus, Ohio) is a leading manufacturer of electronics based in Hilliard, OH. With advanced design and engineering expertise, AdL provides a range of products and services, including prototype-to-production, circuit design, PCB layout and control panel assembly for various industries. A 38% growth in a five-year period created significant challenges for AdL. Their commitment to delivering high quality products at competitive prices propelled them into very rapid expansion in a short time frame. Employees and management were consumed with meeting production demands, and spent more time firefighting than improving operations. Often, management were called upon to perform tasks that frontline leaders or other employees could have handled. Challenges were regularly solved by heroic measures, significant overtime hours or altering production schedules to meet ever-increasing customer demands.
Upon engaging with Definity Partners, the AdL management team and employees identified five targeted functions for improvement. By implementing 5S practices, a one-piece continuous flow system and lean simulation training, the AdL team achieved significant results almost immediately.
Inventory Control (IC)
The IC department is responsible for receiving, inventory management, packaging and shipping. The IC team realigned workflow in the building, eliminating wasted travel time and additional space. They also moved packaging/shipping and receiving, and developed a new layout in the stock room, which led to increased performance 22% better than historically recorded. Cable / Box / Panel (CBP) The CBP area is split between the first and second floor of the operation. This team develops custom design work ranging from cable assemblies to large panel builds. The team had multiple start times and collectively recognized the challenges of implementing a continuous one-piece flow process. In order to ensure success, they voluntarily aligned their start times to match up with one another. The layout and scheduling changes led to a 25% overnight improvement in productivity for that area. Thru Hole The Thru Hole is the most labor-intense area within AdL Technology operations. Here, components are hand-placed onto boards and soldered into place. The work includes preparing parts for assembly, placement, soldering and finishing work for final assembly. Prior to engaging with Definity Partners, this process flowed through four rooms in a crossing pattern and moved in batches – one person would start a job and complete the next several operations by themselves. Definity conducted lean simulations to demonstrate the value of a balanced one-piece workflow. During the effort, many workstations were removed, a wall was torn down and the operation was streamlined to reduce waste. These changes resulted in a one-room operation with centrally located prep stations, 50% fewer build stations and smooth flow. Surface Mount The Surface Mount function is composed of several highly automated processes. Through daily huddles, the team began to communicate goals and expectations, then resolve the issues that prevent them from hitting these targets. By focusing on utilization and uptime, the team centered their efforts on keeping the machines up and running. Since engagement, their effort has resulted in a 10% performance increase. Test Department To ensure the highest quality products, every part moves through the test department for inspection. By revising test and inspection procedures, the team can focus their skill sets accordingly, and highlight areas for development and cross training. 5S activities have helped standardized workstations and create a great visual workplace. The team’s efforts have resulted in a 14% increase in throughput and 50% reduction in accounted-for hours. Starting from a basement in 1996, AdL Technology grew their business by hard work and dedication. The leadership team quickly recognized the need to invest in their people in order to generate continuous improvement. Through a focused effort with Definity Partners, the AdL team came together to improve how employees solve problems, share resources and improve day-to-day performance.
Key sustainable improvement tools implemented by Definity Partners included: Improved Communication
Better and Timely Information
Lean Concepts Implemented
|
What they had to say “Mike Jarvis of Definity Partners asked me the first day, ‘How do I know you had a good day?’ I told him we got all our kits done. I laugh at the response I gave him because now I can see how much work I have and how long it should take. Now I can REALLY answer that question. I like it!” Katie Perry
Inventory Control
AdL Technology
“I am so excited about the one-piece flow; we completed a work order for 432 pieces in only 9 hours. History shows us that we built 600 pieces at 54 hours and 702 pieces at 64 hours and 360 pieces at 32 hours. I can’t believe what a difference the one-piece flow makes.” Becky Napier
Thru Hole Team Lead
AdL Technology
|